The Cost of Reactive Maintenance Is Already in Your Numbers

Tony Morsillo

Tony Morsillo | Sep 28, 2026

Last Updated: Sep 28, 2026

Key Takeaways

  • A reactive plant and a planned one buy roughly the same repairs. What the reactive one pays extra for is the timing, and the machine picks that.
  • The premium is charged to lines that exist for other reasons, each with an accurate explanation attached, so an expensive method reads as bad luck.
  • The plant manager is the only person who sees the overtime, the freight and the lost output in the same room, which makes the arithmetic theirs to run.

The cost of reactive maintenance is already in your numbers. You approved most of it last month, in pieces small enough that none of them needed a meeting. Overtime on a Saturday. A freight bill marked urgent. A short shift on the packing line. Every one of those arrived with a cause attached, and the cause was always an event. A bearing went. A pump failed. Bad week. The explanations are accurate, and they are the reason the total never becomes a decision.

Why doesn't the cost of reactive maintenance show up as a line you can point at?

Because it is a premium rather than a purchase. Reactive maintenance rarely buys a plant anything it would not have bought anyway. The same bearing gets replaced either way, by the same person. What changes is who picks the hour, and the hour sets the price.

No ledger has a field for that. A purchase order records what was bought and what it cost, and the urgency behind the cost leaves no mark on it. So the premium breaks into four pieces, and every piece lands somewhere it makes perfect sense.

  • Labour at the hour the machine chose. Overtime rates, call-out minimums, and a crew pulled off scheduled work part way through it.
  • Parts at the speed the line needs. Next-day freight, list price from whoever has stock, and sometimes a substitute that fits well enough to run.
  • Output nobody can buy back. The hours the line stood still are the only item here with no supplier and no invoice.
  • The planned work that paid for the rescue. Every emergency is staffed by cancelling something, so a failure this week quietly books a share of the next one.
Add the four together and you have the price of the timing. Leave them apart and you have four ordinary costs, all of them real, none of them about maintenance strategy.

How much more does the same job cost when the machine picks the time?

Several times more, and the range is wide. Dr Klaus Blache at the University of Tennessee's Reliability and Maintainability Center puts emergency repairs at three to more than ten times the cost of the same work done as planned maintenance. Same part. Same labour hours. Often the same technician.

That multiplier is the price of having no say in when.

The width of that range tells you where your own plant sits. At the low end, a pump swapped on a Tuesday afternoon with the part in stores. At the high end, that same pump on a Sunday night, with a courier, a contractor, and a line that cannot run until it is back. The spread in the figure tracks the spread in how badly timing can go, and timing goes worst on the assets nobody has scheduled.

Is that the equipment, or the method?

The method. Two plants running comparable machinery post very different downtime numbers, and the difference follows how the work gets scheduled. A NIST study by Thomas and Weiss compared manufacturers on exactly that: those leaning on predictive and preventive work reported 52.7% less unplanned downtime than their reactive-reliant peers. Roughly half of the unplanned hours turn out to be a scheduling choice.

It is an operating condition rather than an incident. ABB's Value of Reliability survey, built on 3,215 maintenance decision-makers, found that 69% of industrial businesses hit unplanned downtime at least monthly. For 8% of them, it happens daily.

One operation makes it concrete. Holistic Industries moved its maintenance onto a planned footing, then set its first full year against the one before.

  • Mechanical, electrical and plumbing expenses down 68%.
  • Maintenance costs down 36%.
Two lines of the same bill, inside twelve months. The equipment did not change that year.

Why can't maintenance tell you what reactive work costs when you ask?

Because the number you want is a comparison, and a comparison needs the planned version of the job to exist somewhere in a record. Ask what last quarter's breakdowns cost and you will get invoices. Ask what those same jobs would have cost scheduled, and the answer has to come from work that was scheduled, recorded and closed against the same assets. In a reactive operation, that half of the record was never written.

The industry's habit is to buy the report and skip the record. A cost report is an output. Whether anyone logged which jobs were planned is the input, and no output beats its input.

Why has a plant that can see all of this kept paying it?

Because urgency suspends the comparison. An emergency spend gets approved at a moment when the alternative has already gone, so nobody is ever choosing the expensive option. They are signing off the only one left.

What holds an operation in place is a belief about difficulty rather than a judgement about price. Fixing this looks harder than living with it. A plant manager who would push back hard on a premium in a supplier contract will sign that same premium in overtime, week after week. Each instance arrives as an emergency, and emergencies are exempt from comparison.

So the arithmetic tends to get run for the first time after something breaks badly enough that leadership wants answers. Nobody goes looking for a better method on a quiet Tuesday. It takes a new arrival with something to prove, or a failure too big to absorb. Both work. One of them is the most expensive classroom a plant can book.

The plant manager's position is unusual, and it is why this lands on your desk rather than the maintenance manager's. The overtime sits with payroll. The freight sits with procurement. The lost hours sit in a production report. You are the only person who sees all three in one room. Maintenance cannot assemble that view from underneath it. A head of engineering at a manufacturer running fifteen sites told us the change never starts at site level. It arrives from above, or it does not arrive.

The average plant is already moving. Siemens tracked monthly hours lost to unplanned downtime falling from 39 in 2019 to 27 in 2024, so the distance between one plant and another is a method gap now rather than an equipment one. Start with one asset. Pull twelve months of work on it, mark each job planned or unplanned, and add the overtime and freight into the unplanned column. That figure is the cost of reactive maintenance on one machine, and it is the first number here that belongs to you.

References

Tony Morsillo

About the author

Tony Morsillo

Tony Morsillo is the Director of Sales and a co-founder of Zoidii. He has spent over two decades working in SaaS products at companies like Fiix, Fonolo, IBM, and others. Tony has worked with some of the world’s largest manufacturing enterprises to implement maintenance and asset management technologies, improving employee productivity and operational efficiency.

Zoidii mobile app parts count screen

Empower your employees to work more effectively

Sign Up for Our Newsletter

Get CMMS tips, industry monthly news, and product updates from Zoidii.

Sign up today!